The Bramery

About: Alder King has a proudly independent heritage stretching back over a century. Their network of offices and strategic alliances ensure in-depth market knowledge and a truly national perspective which clients rely on.
Needs: Following a fire at the unit, Alder King were instructed by the landlords to return the property to a lettable condition as quickly as possible. To speed up the process, TRS were selected as both builders and roofing works could be undertaken in-house.

bramery-2trs-image-7bramery-3


Client: Alder King

Location: Cheltenham


The TRS Service:

TRS carried out refurbishments and alterations to the industrial unit, which included:

  • Deep clean following fire damage,
  • Removal of existing mezzanine,
  • Renewal of roof purlins, and wall and roof cladding, including all trims, rainwater goods and flashings,
  • Construction of new accessible toilet facility,
  • Overhaul of roller shutter door,
  • Installation of new wall and floor finishes,
  • Sundry electrical power and back ground lighting works,
  • Sundry minor external works.
Download a pdf of this case study here


Why TRS?

We worked closely with our landlord to provide a ‘best value’ outcome and facilitate onward letting of the unit.

  • We worked up a number of cost plans and made added value suggestions, including the removal of the internal mezzanine, which allowed the client to evaluate their options and easily make decisions.
  • TRS scaled back the scope and cost and provided a much more appealing and lettable space.